New Projects

Torrens Island Power Station

Controls and Instrument Upgrade

IIS are currently working with Yokogawa to complete the Torrens Island Power Station, B Station, Controls and Instrument upgarde. This involves the complete replacement of the main control system, along with the replacement and integration of other power station equipment.

This project started in November 2008 and is due for completion second half of 2011.

Epic Energy

Moomba Adelaide Pipeline

IIS are working with Epic Energy on capital improvements to equipment on the Moomba to Adelaide Pipeline.

Several projects are being progressed, including upgrades to Pipeline Station Control panel equipment, replacement of Compressor Control Panels and upgrades to compressor station Cathodic Protection cabling.

Clough Seam Gas

Moranbah Compressor

IIS are working with Clough Seam Gas on the Node 2 de-bottlenecking Project to install a new CSG compressor at the existing Arrow Energy Moranbah compressor site.

IIS are installing interconnecting cabling, field instrumentation, earthing, lighting etc for the compressor. This includes installation in electrical hazardous areas and completion of the hazardous area documentation for this work.

Penrice

Ammonia Monitor installations

IIS are working with Penrice to install new Amonia monitoring equipment in the Distillation building at the Osborne Plant in SA.

IIS are installing the monitors, installing the field cabling and additional field junction boxes to connect the equipment to the plant DCS system.